top of page

Community Center
Master Planning

Klahanie Community Center

PROJECT TYPE Community Planning, Programming
LOCATION Issaquah, WA

AREA 0.8 Acres
COMPLETED 2022 

The community of Klahanie, with nearly 11,000 residents, needs a new community center, including association offices, pool upgrades, and spaces for events. The existing pools and offices have reached the end of their useful lives, having been in constant need of repairs for a number of years. 

​

In order to plan for the future, the community asked us to study what amenities could fit on their existing site, as well as engage in outreach to determine what the community wanted. Through numerous community meetings, surveys, and presentations, we came to a preferred solution. This included an expanded outdoor pool and associated locker rooms, minimal association offices, and some small event spaces for community use. We also determined that their campus should be designed to allow easy expansion in the future, should they want it.

​

In the coming year, the community will begin to raise money and start the process of designing and constructing the buildings.

0-Program Large4.png

Methow Aquatic Center

PROJECT TYPE Community Planning, Programming
LOCATION Twisp, WA

AREA 0.5+ Acres
ONGOING

This community center planning project began as a programming study. Knowing the existing Wagner Pool in Twisp will only last for a few more years, the Friends of the Pool asked us to study whether expanded facilities could fit on the same site. It is one of only a few public lane pools in the county, and as such is used by swim teams for meets and training, as well as recreational use. 

​

After determining that the existing site is too small to meet future needs, we began a process of studying nearby sites to find the best option for a minimum 6-lane pool, a separate recreational pool, and associated building. Ultimately one site was chosen for its proximity to town, existing utilities, and appropriate size. We also created a preliminary program, sized and priced, for the community to use as a goal. 

​

This is a long-term project, with many devoted community members involved. We have been with them every step of the way, including ongoing assistance while they look for funding opportunities. It is hoped that a first phase, with pools and a minimal building, can be completed within a few years.

2-Concept Plan-Large-Vert.jpg

Upper Kittitas
Recreation Area

PROJECT TYPE Community Planning, Programming
LOCATION Cle Elum, WA

AREA 5 Acres
COMPLETED 2022

The town of Cle Elum acquired a 5-acre parcel to use as a sports and recreation complex. The town is located in the Cascade Mountains, and an indoor, public recreation and community center is much needed. In the very early phases, we were brought in to assist with programming and pricing studies, to determine what the community really wanted and how much it would cost. 

​

A number of options were considered, from minimal to massive. Phased options were put forward as well. Ultimately, the community wanted to invest in the largest possible option for the building, with sports fields constructed in the future.

​

After completing early feasibility studies, the community struggled to find the necessary funding. Further progress on the project was put on hold.