Accessibility Compliance Surveys & Upgrades

Seattle Justice Center

PROJECT TYPE Accessibility Survey & Upgrade
LOCATION Seattle, WA

AREA 14 Floors
COMPLETION DATE 2020

This survey and upgrade began on the Seattle Justice Center in 2020. The building was completed in 2002, predating the latest accessibility codes. Unfortunately, we found that it also did not meet many of the codes that would have been enforced at time of construction, making upgrades all the more complicated.

​

We began by surveying the entire project area, which covered all public areas and restrooms in the building. This is a multi-day process to confirm the issues needing to be dealt with. Once we understand the scope of the upgrade, we begin to come up with solutions and document them. The simplest solutions are always the ones implemented - these types of projects rarely allow for the removal or relocation of walls, for example, so we must work on the space we already have. Ultimately, these types of ongoing upgrades are necessary to keep a building accessible for all, and our work helped make this building a better experience for all of its users.

municipal_court.jpeg

Seattle Municipal Tower

PROJECT TYPE Accessibility Survey & Upgrade
LOCATION Seattle, WA

AREA 17 Floors
COMPLETION DATE 2021

This accessibility upgrade was one of the largest the City of Seattle took on in a single project, covering 17 floors of the Seattle Municipal Tower. The building was completed in the 1980's, predating the Americans with Disabilities Act. Since it is a tower a lot of areas, especially restrooms, are hemmed in by unmovable elements like the elevator shafts and mechanical rooms. This made a full upgrade impossible in some places, but we worked on the principle of making things as accessible as possible. 

​​

Like with other projects, we began with a multi-day survey of all the areas in the project scope. We documented hundreds of items that needed upgrades, alterations, or total removal. Given the limitations of the building, we often had to get creative with solutions - like changing door swings so they could be approached and operated more easily. This project was completed in close collaboration with the city's own accessibility compliance manager, who helped to make sure every possible solution was implemented.

Project-Profile-Seattle-Municipal-Tower.webp

Other Surveys & Upgrades

PROJECT SeaPark Garage
LOCATION Seattle, WA
AREA 7 Floors
COMPLETED 2024

PROJECT Seattle Center Armory Restrooms
LOCATION Seattle, WA
AREA 700 SF
COMPLETED 2023

PROJECT
Fort Vancouver Regional Library
LOCATION Vancouver, WA
AREA 3000 SF
COMPLETED 2023

Surveys and reviews of drawings are necessary on many projects, including ones that are more than just an accessibility upgrade. The projects listed above are a small sample of projects that have needed upgrades.

 

Seapark Garage required regrading of concrete in a 10-story parking garage in order to make it accessible. We also added ramps and fixed curb cuts, all to create an accessible route from the garage to City Hall.

​

The Armory Restrooms was a full renovation of the restrooms at the Seattle Center Armory (pictured). The building was originally constructed for the Seattle World's Fair in 1962, and the restrooms had only been significantly upgraded once since. Creating an accessible space in a mid-century building can be a challenge, but it is important that any space, especially one as popular as this, be accessible to all.

​

At the Fort Vancouver Regional Library, a library service center was inserted into an existing cinder-block grocery store. This fundamentally meant everything was squeezed into a large concrete box. Making sure all areas remained accessible, including a courtyard, loading docks and offices, was at times a challenge. The clients also wanted all restrooms to be gender-neutral, which required extra careful design, both to make them comfortable and to comply with codes.